


1 Stainless steel . it is good for Food ,pharmacical,chemical packing
2 Combined Hopper or Split Hopper both fine for cleaning
3 The filling weight can be set on the Touch Screen According to Powder density
4 The Free flow device to stop the powder falling and Keep high accuracy packing.
5 The machine can be good for different material packing with different parts.
6 sero Motor control the filling
Model | DH-B2-1L | DH-B2-10L |
Filling weight | 1-500g | 10-5000g |
Filling accuracy | ≤100g,≤±2%; 100-500g,≤±1% | ≤100g,≤±2%; 100-500g,≤±1%; ≥500g,≤±0.5% |
Filling speed | 30-80 times/min | 30-80 times/min |
Power supply | 3P AC208-415V 50/60Hz | 3P AC208-415V 50/60Hz |
Total Power | 0.93kw | 1.4kw |
Total weight | 130kg | 260kg |
Overall dimension | 800*790*1900mm | 1140*970*2030mm |
Hopper volume | 25L ( enlarged size 35L ) | 50L(enlarged size 70L) |


1. Are you factory or trading company?
We are factory with 20 years experience. Rich experience in the powder filling machine field.
2. Can i visit your factory and send team for learing and inspect?
Yes, sure. Welcome to visit us!
3. What's your warranty and after-sale service?
One year warranty and lifelong after-sale service via skype/email/mobile/whatsapp.
4. What is the payment term?
30% T/T deposit and 70% T/T balance payment before shipping.
5. How long is the delivery time?
About 20- 40 working days.